Legislation Details

File #: 2027-0045   
Type: Agenda Item Status: Agenda Ready
File created: 9/25/2026 In control: City Council
On agenda: 10/20/2026 Final action:
Title: Greenway Reserve Subdivision Developer’s Agreement
Attachments: 1. Developers Agreement.pdf, 2. Aerial Map.pdf, 3. Case Map.pdf, 4. Conceptual Subdivision Plan.pdf, 5. PD Plan.pdf, 6. PD Standards.pdf
Date Action ByMotionResultAction DetailsMeeting DetailsVideo
No records to display.
Submitted By: Karen Cupp
presenter
Presentation By: Aubrey Hale
end
Department: Growth Management
/
FORMAL TITLE:
title
Greenway Reserve Subdivision Developer’s Agreement
end
/
OCALA’S RELEVANT STRATEGIC GOALS:
Quality of Place
/
PROOF OF PUBLICATION:
N/A
/
body
BACKGROUND:
This agenda item is a proposed Developer’s Agreement for Greenway Reserve, a single-family residential subdivision consisting of 55 single-family lots, five tracts, and 0.54 miles of road on 12.67 acres.

Key Points:

The developer is the Boyd Real Estate Group.

The agreement addresses the construction and maintenance of the subdivision improvements.

Facilities including roadways, storm conveyance system within the dedicated public right-of-way, potable water, and sanitary sewer systems will be publicly maintained.

The Greenway Reserve Homeowners’ Association, Inc. will maintain drainage retention areas and conveyance systems outside of the public right-of-way.

In lieu of construction, the City Engineer has approved a contribution to the sidewalk fund in the amount of $37,500 for the sidewalk required along NE 25th Avenue.

A solid waste service fee of $14,575 (55 lots x $265 per lot) is required prior to plat recordation.

A tree shall be planted on each lot prior to issuance of the certificate of occupancy for any single-family residence constructed. The tree must be at least 3.5-inch caliper diameter measured at six inches above ground level in accordance with the plans approved for the subdivision.


FINDINGS AND CONCLUSIONS:
The subdivision has been developed in accordance with the approved PD Plan, PD Standards Book, and Conceptual Subdivision Plan.

Infrastructure improvements are substantially complete, and the developer is ready to submit for final plat review.
City Council approval of a developer’s agreement is required prior to the final plat submittal. Final plat approval is no longer required by City Council.
The project engineer must certify the final project cos...

Click here for full text