File #: 2025-1086   
Type: Agenda Item Status: Agenda Ready
File created: 4/3/2025 In control: City Council
On agenda: 5/6/2025 Final action:
Title: Approve Developer's Agreement between the City of Ocala and WPG-Triple Crown, LLC for property located at SE 52nd Street at US 301 C-Store and reimbursements in an amount not to exceed $122,936
Attachments: 1. Triple Crown - City Dev Agreement (SML 6.21.24) - WES edits - 03-04-2025, 2. MUI QUOTE
Date Action ByMotionResultAction DetailsMeeting DetailsVideo
No records to display.
Submitted By: Rusella Bowes-Johnson
presenter
Presentation By: Sean Lanier
end
Department: Water & Sewer

STAFF RECOMMENDATION (Motion Ready):
title
Approve Developer's Agreement between the City of Ocala and WPG-Triple Crown, LLC for property located at SE 52nd Street at US 301 C-Store and reimbursements in an amount not to exceed $122,936
end

OCALA'S RELEVANT STRATEGIC GOALS:
Economic Hub

PROOF OF PUBLICATION:
N/A

body
BACKGROUND:
WPG-Triple Crown, LLC (Owner & Developer) wishes to develop a parcel of property located at SE 52nd Street at US 301 into a convenience store. In connection with the development of the property, the Developer has requested that the City of Ocala (City) provide expanded central water and wastewater services. The City has agreed to do so pursuant to the terms and conditions of this Agreement and the City Code.

FINDINGS AND CONCLUSIONS:
* The City has agreed to reimburse the Developer for a portion of the actual costs incurred to design, install, survey, test, inspect, maintain, and repair both the force main and the upsized water main.

* Based on a bid obtained from the approved contractor, it is anticipated that the cost to install and survey the force main will be $186,386, and the cost to perform the water main upsizing will be $99,979. The City shall reimburse Developer 37.13 percent of the force main costs, which equates to $69,201, and 37.71 percent of the water main, which equates to $37,700. These costs represent the difference between the infrastructure size the Developer needs to service the project and the additional capacity the City desires.

* The City shall have no obligation to reimburse force main costs and water main upsizing costs that exceed $122,936.15 in the aggregate (i.e., $106,901 plus a 15 percent contingency) unless such excess cost is due to unforeseen conditions that were not readily observable by the Developer and the Approved Contractor before commencing work. Such excess cost shall be ...