Legislation Details

File #: 2026-1458   
Type: P&Z Subdivision Status: Agenda Ready
File created: 5/21/2026 In control: Planning & Zoning Commission
On agenda: 6/8/2026 Final action:
Title: TBMI Commercial Outparcel Development Conceptual Subdivision (SUB25-0011)
Attachments: 1. City Engineer Approval.pdf, 2. Aerial Map.pdf, 3. Case Map.pdf, 4. Conceptual Subdivision Plan.pdf, 5. Boundary Survey.pdf, 6. PD Plan.pdf, 7. PD Standards.pdf
Date Action ByMotionResultAction DetailsMeeting DetailsVideo
No records to display.
Submitted By: Karen Cupp
presenter
Presentation By: Karen Cupp
end
Department: Growth Management

FORMAL TITLE:
title
TBMI Commercial Outparcel Development Conceptual Subdivision (SUB25-0011)
end

OCALA'S RELEVANT STRATEGIC GOALS:
Economic Hub

PROOF OF PUBLICATION:
N/A

body
BACKGROUND:
The proposed project is for a commercial subdivision consisting of seven lots and two tracts on 35.01 acres.
The developer is TBMI II, LLC.
The plan was prepared by Kimley-Horn and Associates.
The property is zoned Planned Development (PD).
Key Points:
* A traffic study has been approved for this development.

* Access to the adjacent publicly maintained roadways were established under the PD plan approved for this development.

* The plan proposes a 50-foot-wide, future cross-access and utility easement which will provide access to lots three, four, five, and six. If any of these lots are developed separately from the others, the cross-access road construction will be required in accordance with the subdivision improvement plan.

* A 50 foot right-of-way is proposed for access to lots one and two and will be constructed with the subdivision improvements.

* The proposed road, potable water, gravity sewer, and drainage system will be privately maintained by the association established for the development.

* The lift station and force main are proposed for public maintenance.

FINDINGS AND CONCLUSIONS:
* The conceptual subdivision plan is designed in accordance with the approved PD Plan and Standards Book.

* Access to the individual lots will be from the internal road system. No lot within the subdivision will have direct access to the adjacent publicly maintained roadways.

* Site plans are required at the time of individual lot development.

* The future cross-access road will not be constructed if a single development is proposed for lots three through six.

Staff recommends approval.


FISCAL IMPACT:
City will assume maintenance responsibility of the force main...