Submitted By: Paul Constable
presenter
Presentation By: Sean Lanier
end
Department: Engineering
/
FORMAL TITLE:
title
Contract with Joseph Hoffman Construction, LLC to provide all labor, materials, equipment, and services necessary for the construction of concrete pads and T-hanger taxilane rehabilitation at Ocala International Airport for a total expenditure not to exceed $932,932
end
/
OCALA’S RELEVANT STRATEGIC GOALS:
Operational Excellence
/
PROOF OF PUBLICATION:
Bid released to the public: 9/9/2026; Newspaper ad published: 9/18/2026
/
body
BACKGROUND:
The Ocala International Airport (OCF) has identified key locations for infrastructure improvements designed to enhance the operational capacity and efficiency of the airport’s general aviation and maintenance activities. These locations include three areas requiring concrete pavement rehabilitation and a separate location requiring T-hangar taxilane rehabilitation. The proposed improvements will improve airfield access, increase operational efficiency, and support the continued growth of airport operations.
On May 6, 2025, the City adopted Budget Resolution No. 2025-152, authorizing the acceptance and appropriation of $543,320 through a Public Transportation Grant Agreement (PTGA) with the Florida Department of Transportation (FDOT) for the design and construction of fuel farm, wash rack, and parking area concrete pads, as well as the rehabilitation of the T-Hangar taxilane at OCF. The resolution also authorized the transfer of $135,830 from OCF reserves account to provide the required local matching funds (20%).
On March 3, 2026, the City adopted Budget Resolution No. 2026-131, authorizing the acceptance and appropriation of an additional $478,285 through a supplemental PTGA with FDOT to continue these improvements. The resolution further authorized the transfer of $119,572 from OCF reserves account to satisfy the corresponding local match requirement (20%).
Collectively, Budget Resolutions No....
Click here for full text