Legislation Details

File #: 2026-1443   
Type: P&Z Subdivision Status: Agenda Ready
File created: 5/19/2026 In control: Planning & Zoning Commission
On agenda: 6/8/2026 Final action:
Title: Mockingbird Ridge Conceptual Subdivision (SUB25-0016)
Attachments: 1. City Engineer Approval.pdf, 2. Aerial Map.pdf, 3. Case Map.pdf, 4. Conceptual Subdivision Plan.pdf, 5. Boundary Survey.pdf, 6. PD Plan.pdf, 7. PD Standards.pdf
Date Action ByMotionResultAction DetailsMeeting DetailsVideo
No records to display.
Submitted By: Karen Cupp
presenter
Presentation By: Karen Cupp
end
Department: Growth Management

FORMAL TITLE:
title
Mockingbird Ridge Conceptual Subdivision (SUB25-0016)
end

OCALA'S RELEVANT STRATEGIC GOALS:
Quality of Place

PROOF OF PUBLICATION:
N/A

body
BACKGROUND:
Mockingbird Ridge is a single-family residential subdivision consisting of 493 single-family lots, five tracts, and 3.74 miles of roadway on 169.38 acres.

The developer is Boyd Development LLC.

The plan was prepared by Kimley-Horn & Associates.

The property is zoned Planned Development (PD) and is part of the overall Heathbrook Development of Regional Impact.

Key Points:
* The plan identifies three phases for the development of this subdivision.

* Setbacks: Front - 20 feet
Side - 5 feet (20 feet for street side yard setback)
Rear - 10 feet

* Lots will be a minimum of 50-feet-wide, with a minimum lot area of 6,000 square feet.

* The typical residential right-of-way is 50-feet with curb and gutter, ten-feet utility easements and five-feet sidewalks on both sides.

* Roadways, drainage retention areas, and the conveyance system are proposed for private maintenance by the Homeowner's Association (HOA) and Community Development District (CDD).

* Potable water and sanitary sewer systems will be publicly maintained following the standard one-year maintenance period.


FINDINGS AND CONCLUSIONS:
* The conceptual subdivision plan is designed in accordance with the approved PD plan and Standards Book.

* A developer's agreement for the subdivision is required with the improvement plan submittal and must be approved and recorded prior to submitting the final plat application.

* The amenity center, shown as Tract C, requires a site plan for development.

Staff recommends approval.

FISCAL IMPACT:
The City will assume maintenance responsibility of the potable water and sanitary sewer systems following the standard maintenance period.