File #: 2023-0947   
Type: Agenda Item Status: Passed
File created: 4/17/2023 In control: City Council
On agenda: 5/16/2023 Final action: 5/16/2023
Title: Approve Task Work Order with Kimley-Horn and Associates, Inc. for engineering services related to the wastewater force main upgrade from Lift Station No. 5 to No. 17 in the amount of $198,832
Attachments: 1. FOR COUNCIL - Individual TWO 2023-03 (LS 5 to LS 17 FM Design), 2. FULLY EXECUTED - Continuing Professional Services Agreement (ENG 210895)

Submitted By: Hector Colon

presenter

Presentation By: Sean Lanier

end

Department: Engineering

STAFF RECOMMENDATION (Motion Ready):

title

Approve Task Work Order with Kimley-Horn and Associates, Inc. for engineering services related to the wastewater force main upgrade from Lift Station No. 5 to No. 17 in the amount of $198,832

end

OCALA’S RELEVANT STRATEGIC GOALS:

Operational Excellence, Quality of Place

PROOF OF PUBLICATION:

N/A

body

BACKGROUND:

The City of Ocala (“City”) Wastewater Master Plan, prepared by Kimley-Horn and Associates, Inc. (“Kimley-Horn”) in August 2019 identified and recommended a list of improvements needed for the City’s wastewater system. The wastewater force main upgrade from Lift Station No. 5 to No. 17 was listed as Improvement No. 9. This improvement will allow the option of redirecting wastewater flows from Lift Station No.5 to both Water Reclamation Facilities providing redundancy to the system. This project is listed on the FY23 Engineering Business Plan.

FINDINGS AND CONCLUSIONS:

Kimley-Horn will provide engineering services for the design of a new force main to route the existing wastewater flows from Lift Station No.5 to No.17 and the required pump upgrades for Lift Stations No. 38, No. 88 and No. 57. Kimley-Horn will prepare the construction documents and permitting and assist the City with the bidding and construction phase services. The design will consist of approximately 9,000 linear feet of new 18-inch force main along Southwest 17th Street (SR 464) and Southwest 19th Avenue Road (Easy St.). The design will divide the construction into three phases.

FISCAL IMPACT:

Funding for this agreement is available in account string 308-030-332-536-69-65010 in the amount of $168,750.50 and account string 308-060-332-536-69-65010 in the amount of $30,081.50.

PROCUREMENT REVIEW:

These services were procured in compliance with the City’s Procurement Policy. 

LEGAL REVIEW:

The underlying Master Services Agreement has been approved for form and legality by former City Attorney, Robert W. Batsel, Jr.

 

ALTERNATIVE:

                     Approve with Changes

                     Table

                     Deny