Legislation Details

File #: 2026-1443   
Type: P&Z Subdivision Status: Passed
File created: 5/19/2026 In control: Planning & Zoning Commission
On agenda: 6/8/2026 Final action: 6/8/2026
Title: Mockingbird Ridge Conceptual Subdivision (SUB25-0016)
Attachments: 1. City Engineer Approval.pdf, 2. Aerial Map.pdf, 3. Case Map.pdf, 4. Conceptual Subdivision Plan.pdf, 5. Boundary Survey.pdf, 6. PD Plan.pdf, 7. PD Standards.pdf
Submitted By: Karen Cupp
presenter
Presentation By: Karen Cupp
end
Department: Growth Management

FORMAL TITLE:
title
Mockingbird Ridge Conceptual Subdivision (SUB25-0016)
end

OCALA'S RELEVANT STRATEGIC GOALS:
Quality of Place

PROOF OF PUBLICATION:
N/A

body
BACKGROUND:
Mockingbird Ridge is a single-family residential subdivision consisting of 493 single-family lots, five tracts, and 3.74 miles of roadway on 169.38 acres.

The developer is Boyd Development LLC.

The plan was prepared by Kimley-Horn & Associates.

The property is zoned Planned Development (PD) and is part of the overall Heathbrook Development of Regional Impact.

Key Points:
* The plan identifies three phases for the development of this subdivision.

* Setbacks: Front - 20 feet
Side - 5 feet (20 feet for street side yard setback)
Rear - 10 feet

* Lots will be a minimum of 50-feet-wide, with a minimum lot area of 6,000 square feet.

* The typical residential right-of-way is 50-feet with curb and gutter, ten-feet utility easements and five-feet sidewalks on both sides.

* Roadways, drainage retention areas, and the conveyance system are proposed for private maintenance by the Homeowner's Association (HOA) and Community Development District (CDD).

* Potable water and sanitary sewer systems will be publicly maintained following the standard one-year maintenance period.


FINDINGS AND CONCLUSIONS:
* The conceptual subdivision plan is designed in accordance with the approved PD plan and Standards Book.

* A developer's agreement for the subdivision is required with the improvement plan submittal and must be approved and recorded prior to submitting the final plat application.

* The amenity center, shown as Tract C, requires a site plan for development.

Staff recommends approval.

FISCAL IMPACT:
The City will assume maintenance responsibility of the potable water and sanitary sewer systems following the standard maintenance period.

PROCUREMENT REVIEW: